Xinyu Iron & Steel / XISCO: Baowu relationship and plate capabilities
Last verified:
Identifying Xinyu (XISCO) within Baowu without confusing it with Baosteel.
Identifying Xinyu (XISCO) within Baowu without confusing it with Baosteel.
| At a glance | |
|---|---|
| Location / operating footprint | Xinyu, Jiangxi, China |
| Reported scale | No standalone worldsteel 2025 top-50 tonnage shown for Xinyu; production is distinct from parent-group reported output |
| Main product families | Plate, hot-rolled and related steel products; grade and thickness scope requires works confirmation |
| Last verified | 2026-10-10 |
Ownership, historical names and corporate identity
Xinyu, often called Xinsteel or XISCO, is a separate listed steel producer and should not be called Baoshan Iron & Steel merely because it is within the wider Baowu system. Public 2025 annual-report ownership information identifies a Baowu holding in Xinyu Iron & Steel.
Products, works and manufacturing scope
The mill identity is relevant when evaluating heavy and medium plate, but manufacturing limits, rolling/heat-treatment facilities and marine/offshore approval require current mill documentation. Do not infer specific offshore grades from group descriptions.
Common sourcing confusion
Xinyu/Xinsteel/XISCO are market names of a different operating producer from Baosteel or Magang; MTCs and project approvals must be independently evaluated.
Procurement takeaway
For thick plate and fabrication projects, request legal plant, slab source, plate rolling and heat-treatment sites, UT class, thickness limits and grade-specific MTCs.
What to reverify before an RFQ or PO
- Exact legal manufacturer and registered Chinese name; works location and MTC issuer.
- Historic names and dates relevant to existing stock or older approvals.
- Product route and dimensional range at the quoted site, not at parent-group level.
- Current ISO, class, API, CE/FPC or PED scope where applicable.
- End-client/EPC approval for the exact site, grade and product.
- Seller/exporter relationship to actual producer, heat traceability and certificate authenticity.
References and verification sources
Ask MetalMate about this article
Xinyu Iron & Steel / XISCO: Baowu relationship and plate capabilities
AI assistant · Responses are generated and can contain errors; verify specifications before acting.
