Magang / Maanshan Iron & Steel: Baowu ownership, products and the Ma Steel name
public-source-checked; ownership, capacity, certificates and customer approvals require periodic re-verification
Last verified:
A guide to Magang / Maanshan Iron & Steel, its Baowu ownership, common market names and core product families.
A guide to Magang / Maanshan Iron & Steel, its Baowu ownership, common market names and core product families.
| At a glance | |
|---|---|
| Headquarters | Maanshan, Anhui |
| Listed company | A-share 600808 / H-share 00323 |
| Ultimate controller | China Baowu |
| 2025 production | ~9.43 Mt long products; ~9.79 Mt plate products; wheels/axles and billet additionally |
| Last verified | 2026-10-07 |
Maanshan Iron & Steel Company Limited is commonly called Magang, Ma Steel, Masteel or Maanshan Steel. It is a distinct listed producer, despite being ultimately controlled by China Baowu.
Ownership
The direct controlling shareholder is Magang (Group) Holding Co., Ltd.; the ultimate controller is China Baowu. The 2025 annual report states Magang Group held 48.49% of the listed company.
Main product families
Magang's current product structure includes:
- special steel billet, bar and industrial wire rod;
- railway wheels, axles, wheelsets and ring forgings;
- structural sections and wire rod;
- hot-rolled, cold-rolled, galvanized, color-coated and electrical steel.
The 2025 report shows approximately 9.425 Mt long-product output, 9.787 Mt plate-product output and 0.247 Mt wheels/axles.
International supply and approvals
Magang exports sections and other steel and also uses Baowu-linked international sales channels. Product certification and customer approval remain specific to Magang and the relevant works; a Baosteel approval should not be assumed to cover Magang.
Procurement takeaway
Do not relabel Magang material as Baosteel simply because both are controlled by China Baowu.
What to reverify before an RFQ or PO
- exact legal manufacturer and works;
- current parent/ownership structure where relevant;
- current production range and size limits;
- ISO/API/class/CE/PED/FPC certificate scope and validity;
- current customer/EPC AVL/AML approval;
- seller/trading entity versus MTC issuer.
References and verification sources
Ask MetalMate about this article
Magang / Maanshan Iron & Steel: Baowu ownership, products and the Ma Steel name
AI assistant · Responses are generated and can contain errors; verify specifications before acting.
