MetalMate.AI
MARKETS / PRICES & INDICATORS

The indicators behind the market.

Dated, source-linked observations—not live or executable quotations.

Showing 13 of 13 observations

Steel price observations

Dated product-level observations and published assessments. Compare only where product, specification and basis are equivalent.

8 observations
Steel price observations. Expand a product for interpretation and source details.
ProductMarketObservationChangeBasisReporting periodSource
High-speed wire rod

Steel price Official source

Specification / category: Specification not stated in source summary

MOFCOM reported a national weekly price highlight of CNY 3,579/t, up 0.2% week on week. The summary does not state a product dimension and is not a complete steel-price series.

Source published: 17 September 2026

MetalMate verified: 23 September 2026

Market prices of important means of production, 7–13 September 2026 ↗
China3,579 CNY/t+0.2% w/wNational weekly reported highlightReporting week · 7–13 September 2026MOFCOM ↗
Hot-rolled strip

Steel price Official source

Specification / category: Specification not stated in source summary

MOFCOM reported a national weekly price highlight of CNY 3,441/t, down 0.4% week on week. The summary does not state a product dimension and is not a complete steel-price series.

Source published: 17 September 2026

MetalMate verified: 23 September 2026

Market prices of important means of production, 7–13 September 2026 ↗
China3,441 CNY/t-0.4% w/wNational weekly reported highlightReporting week · 7–13 September 2026MOFCOM ↗
Rebar

Steel price Official source

Specification / category: Specification not stated in source summary

MOFCOM reported a national weekly price highlight of CNY 3,342/t, up 0.2% week on week. The summary does not state a product dimension and is not a complete steel-price series.

Source published: 17 September 2026

MetalMate verified: 23 September 2026

Market prices of important means of production, 7–13 September 2026 ↗
China3,342 CNY/t+0.2% w/wNational weekly reported highlightReporting week · 7–13 September 2026MOFCOM ↗
Heavy plate

Steel price Published assessment

Specification / category: S355

Kallanish reported S275 at about EUR 740/t EXW and an S355 premium of approximately EUR 20/t. EUR 760/t is the resulting indicative S355 level, not a separately quoted assessment.

Source published: 12 September 2026

MetalMate verified: 17 September 2026

Italian plate prices tick up on improved demand ↗
Italy≈760 EUR/tNot reportedEXWEUROMETAL / Kallanish ↗
Heavy plate 8–40 mm

Steel price Published assessment

Specification / category: Base-grade / S235 reference

Fastmarkets assessed Southern European domestic plate at EUR 740–760/t EXW on 3 September. Higher slab costs and limited October availability supported the increase.

Source published: 10 September 2026

MetalMate verified: 17 September 2026

European domestic steel heavy plate prices rise on higher slab costs, tighter material availability ↗
Southern Europe740–760 EUR/tNot reportedEXWEUROMETAL / Fastmarkets ↗
Heavy plate 8–40 mm

Steel price Published assessment

Specification / category: Base-grade plate

Fastmarkets assessed Northern European domestic plate at EUR 850–875/t EXW on 3 September amid tight spot availability and project-related mill demand.

Source published: 10 September 2026

MetalMate verified: 17 September 2026

European domestic steel heavy plate prices rise on higher slab costs, tighter material availability ↗
Northern Europe850–875 EUR/tNot reportedEXWEUROMETAL / Fastmarkets ↗
Steel slab

Steel price Published assessment

Specification / category: Import slab

Fastmarkets assessed slab imports into Italy at USD 560–580/t CIF on 3 September. Higher import costs added pressure to re-rolled plate pricing.

Source published: 10 September 2026

MetalMate verified: 17 September 2026

European domestic steel heavy plate prices rise on higher slab costs, tighter material availability ↗
Italy560–580 USD/tNot reportedCIF ItalyEUROMETAL / Fastmarkets ↗
Hot-rolled coil

Steel price Published assessment

Specification / category: HRC

Achievable Northwest European HRC levels were reported at EUR 730–760/t EXW for the week ending 28 August. Tighter imports supported domestic demand.

Source published: 31 August 2026

MetalMate verified: 17 September 2026

European coil and green steel round-up: EU coil price rise to resume in September ↗
Northwest Europe730–760 EUR/tNot reportedEXWEUROMETAL / McCloskey by OPIS ↗

Cost indicators

Input-cost references that may affect steel economics. These are not complete steel prices.

3 observations
Cost indicators. Expand a product for interpretation and source details.
ProductMarketObservationChangeBasisReporting periodSource
Duplex flat products alloy surcharge

Alloy surcharge Supplier surcharge

Specification / category: 1.4462 / Duplex 2205

September 2026 alloy surcharge for 1.4462 / Duplex 2205 in the source’s Sheets (Bleche) category. This is an alloy surcharge only, not a full material price.

MetalMate verified: 17 September 2026

Alloy surcharges ↗
Europe3.94 EUR/kgNot reportedAlloy surcharge — Sheets / BlechePeriod start · September 2026preschstahl ↗
Stainless flat products alloy surcharge

Alloy surcharge Supplier surcharge

Specification / category: 1.4404 / 316L

September 2026 alloy surcharge for 1.4404 / 316L in the source’s Sheets (Bleche) category. This is an alloy surcharge only, not a full material price.

MetalMate verified: 17 September 2026

Alloy surcharges ↗
Europe4.04 EUR/kgNot reportedAlloy surcharge — Sheets / BlechePeriod start · September 2026preschstahl ↗
CBAM certificate price

Carbon cost Official source

Specification / category: Carbon-cost context — not a steel quotation

Official CBAM certificate price applicable to Q2 2026. This is carbon-cost context and must not be interpreted as a steel price or a complete landed-cost calculation.

Source published: 6 July 2026

MetalMate verified: 23 September 2026

Price of CBAM certificates ↗
European Union75.28 EUR/tCO₂Not reportedOfficial quarterly CBAM certificate priceApplicable quarter · Q2 2026European Commission ↗

Market context

Official macro and currency indicators provided for context. They are not steel quotations.

2 observations
Market context. Expand a product for interpretation and source details.
ProductMarketObservationChangeBasisReporting periodSource
EUR/CNY reference rate

Exchange rate Official source

Specification / category: Foreign-exchange context

ECB reference rate of CNY 7.6930 per EUR. This rate is market context only and is not a transaction or steel price.

Source published: 21 September 2026

MetalMate verified: 23 September 2026

Chinese yuan renminbi / euro reference exchange rate ↗
Europe / China7.6930 CNY/EURNot reportedECB reference rate — informational onlyEuropean Central Bank ↗
Basic-metals producer price index

Market index Official source

Specification / category: NACE C24 aggregate — not a steel quotation

Eurostat’s EU27 producer-price index for manufacture of basic metals (NACE C24) was 124.5, with a 0.6% monthly increase. It is an aggregate industrial indicator, not a price for a specific steel product.

Source published: 23 September 2026

MetalMate verified: 23 September 2026

Producer prices in industry, total — monthly data ↗
European Union124.5 index points+0.6% m/mEU27, domestic and non-domestic markets, NSA, 2021=100Reference month · July 2026Eurostat ↗