Acciaierie di Calvisano: Feralpi EAF billets feeding Caleotto wire rod
public-source-reviewed; confirm works-specific certifications and procurement approvals
Last verified:
Italian mill profile of Acciaierie di Calvisano S.p.A.: corporate identity, production routes, product range and sourcing checks.
Italian mill profile of Acciaierie di Calvisano S.p.A.: corporate identity, production routes, product range and sourcing checks.
| At a glance | |
|---|---|
| Operating identity | Acciaierie di Calvisano S.p.A. |
| Main Italian production location(s) | Calvisano, Brescia, Italy |
| Manufacturing role | EAF specialty-steel billet producer, upstream of wire-rod rolling |
| Last source review | 2026-10-11 |
Company identity and history
Acciaierie di Calvisano is an operating steelmaking identity inside Feralpi Group. Its role differs from group reinforcing-steel operations and from Caleotto, the downstream rolling operation.
This company should be assessed as a specific operating manufacturer, not merely as a familiar brand name. Historical names and group affiliations may explain an old mill certificate without confirming that a different current site has equivalent approvals.
Main products and manufacturing role
Special-steel cast billets used for subsequent rolling into high-quality wire rod.
Manufacturing capability: Feralpi lists continuous-cast billet sections of 120–160 mm and distinguishes billet production at Calvisano from wire rod rolling at Caleotto. Product families include quenched-and-tempered, spring, fastener and cold-heading, case-hardening and other engineering steel grades.
For a complex steel order, the decisive questions are whether the entity melts steel, rolls it, forges it, manufactures tubes from purchased inputs, or performs subsequent finishing. Each activity can involve a different certifying legal entity and production works.
Certifications and project qualification
Public portfolios demonstrate products and manufacturing experience, but do not establish current EN 10204 certificate scope, CE/UKCA status, PED qualification, class approval, API license, client AVL entry, or acceptance for a specific project. These must be checked by exact operating works, product, grade, dimensions, standard edition and expiry date.
Do not treat a management-system certificate such as ISO 9001 as interchangeable with product or project approval.
Procurement takeaway
An offer for Caleotto wire rod may refer to Calvisano as melt source. Verify separately the melting plant, caster, rolling plant and MTC issuer; ask for heat-to-coil traceability, grade, dimensions and downstream treatments.
What to check before an RFQ or PO
- Exact manufacturer and legal name, melting works and production/finishing site.
- Steel or alloy designation, product standard and edition, order dimensions and delivery condition.
- MTC issuer and traceability to heat, ingot/billet or forging input.
- Applicable EN 10204 certificate type, required NDT, Charpy/CTOD or other tests if specified.
- Current manufacturing range, works-specific qualification and customer-approved-mill requirements.
- Seller/trader identity versus actual producer and Incoterm.
Sources and verification references
Ask MetalMate about this article
Acciaierie di Calvisano: Feralpi EAF billets feeding Caleotto wire rod
AI assistant · Responses are generated and can contain errors; verify specifications before acting.
