WHAT HAPPENED

AISI released its 2025 Annual Statistical Report showing year-on-year growth in domestic shipments and production alongside declining imports. Construction and automotive remained the leading end-use markets for US steel shipments. AISI President and CEO Kevin Dempsey described the report as providing a data-driven picture of the domestic industry.

MetalMate summary of the linked evidence
WHY IT MATTERS

Commercial context

The figures indicate that domestic mills shipped more steel while facing reduced import competition in 2025. The sharper decline in finished-steel imports and their 18% share of apparent consumption suggest greater domestic participation in the US market. Commercial exposure remained concentrated in construction and automotive demand.

MetalMate analysis
KEY DETAILS
  • Domestic steel-mill shipments: 91 million net tons, up five percent from 2024.
  • US raw-steel production: 90 million net tons, up three percent.
  • Total US steel imports: down 13%.
  • Finished-steel imports: down 17%, with an 18% share of apparent steel consumption.
  • Construction and automotive remained the leading end-use markets.
WHAT TO WATCH

Watch whether shipment and production growth continues, whether finished imports regain market share, and how construction and automotive demand develops.

Source & methodology +

MetalMate separates original-source evidence from summary and analysis. Verify the original source before procurement, legal or engineering decisions.

Article status
Published · Version 1
Source date
5 August 2026
MetalMate publication
27 September 2026
Verification
Automated evidence checks; not human reviewed

AISI Releases Annual Statistical Report for 2025 — American Iron and Steel Institute
MetalMate provides an English summary; consult the original wording.