According to Mysteel, Chinese hot-rolled coil and plate FOB prices each declined by $1 per metric tonne, to $498/t and $536/t, respectively. Global trading remained subdued as inquiries from Southeast Asia and the Middle East weakened and buyers stayed cautious. Nevertheless, Chinese HRC was quoted at $610–615/t CFR UAE and $630–635/t CFR Saudi Arabia’s west coast.
MetalMate summary of the linked evidenceCommercial context
Analysis: Softer Chinese FOB pricing indicates pressure from weak spot demand, but higher Gulf delivered quotations suggest destination-specific costs and availability remain important. Tight US supply and production disruptions in South Korea and Japan could support regional prices, while rapidly used EU quotas restrict Turkish mills’ export flexibility.
MetalMate analysis- Mysteel said POSCO’s 120-hour partial strike ran from September 16 to September 21, affecting the Pohang No. 2 and Gwangyang No. 4 hot-rolling mills; it was described as the company’s first production-line strike in 58 years.
- Mysteel reported that a September 12 fire at Nakayama Steel’s Osaka facility temporarily halted hot-rolled coil and plate lines.
- Mysteel reported that Japan’s July steel exports fell 5.3% year on year, including an 18.3% decline in hot-rolled coil exports.
- The US average HRC price reached $1,240 per short ton, up $15 week on week, according to Mysteel, amid extremely tight supply.
- Mysteel said Turkey’s EU export quota was consumed rapidly at the outset under the bloc’s new safeguard measures.
Outlook: Monitor whether Southeast Asian and Middle Eastern inquiries recover, whether disrupted South Korean and Japanese production normalizes, and whether persistent US tightness or EU quota constraints redirect flat-steel trade flows. Chinese export prices may remain under pressure if transaction volumes stay weak.
Source & methodology +
MetalMate separates original-source evidence from summary and analysis. Verify the original source before procurement, legal or engineering decisions.
- Article status
- Published · Version 1
- Source date
- 24 September 2026
- MetalMate publication
- 7 October 2026
- Verification
- Automated evidence checks; not human reviewed
Mysteel全球板材周报:节前成交转淡压制出口,海外供应扰动与贸易保护同步升级(9.20-9.24) — Mysteel / 我的钢铁网
MetalMate provides an English summary; consult the original wording.
